Magis Global –


June 3, 2021

Apartment Doors

Category: General – Tags: – Joan 6:02 pm

Last installed in our apartment door – This is the second entrance. By the time we began to live better, and so we decided to 'pozhirovat' – bought the door from the array. Beautiful such a heavy, solid. Master, who put the door for us, got on remarkably talented and talkative. I did not depart from it even a step, because the prospect of buying yet another canvas for easy money I do not appeal to me. For the first time I saw a set of tools that have not seen even when I repaired the bathroom room. All that he was lying in a large suitcase: the ruler, screwdriver, screwdriver, tape measure, level, plumb bob, chalk, glue, nails, knife, razor (I do not know why she told him.) Also, I saw that the seizure of the loop do miracle electric intrementom called mill and box not being cut example manually by means of a prehistoric gon, simply and quickly by end saws. Master of my first carefully measured hole, then made a markup on the parts of a door frame, then combine all the parts and tried on at the opening.

He made a sample loop, safety bar, having asked me at what height from the floor I need a door handle. For more information see this site: Beth Israel Heart Transplant. Everything was done quietly and carefully. Chips were removed immediately, unnecessary tools shape in back in the drawer. My observations and commentary were seen quietly. Only one we have not agreed in principle, I asked to put the door box on the profile (such how secure the drywall), but he discouraged. I just do not want the box led, and is no longer open the door, but the master assured that everything will be okay. Probably, and he had some kind of its own technology installation of doors: the gaps properly fitted, the optimum amount of foam, precise cutting of the box – but the door at once and still warms my heart a reliable service.

Now I know that if I had a house five doors – I would did not save for their installation. Avaricious pays twice – it's just about me and about my door in the nursery, which, incidentally, still stands today, because the change of the door – this is not a change of shoes: it is long and expensive. One pleases, that none I have not visited the crazy idea to install the door yourself. Because, I think, but frayed nerves, it could still end and hopelessly corrupt and repair a broken finger. And can still change the door? Especially because I want long-door coupe in the bedroom … Well, now I know where my master works. The company "Garant-Service". installation of interior doors

April 21, 2021

ASR Staircase

Category: General – Tags: , – Joan 11:28 am

Avoid misuse: conscious or unconscious purpose of alienation of stairs also increase the risk of accidents. No items, boxes or shelves on stairways must be placed. Even a short-term interim storage sites should be avoided. Use handrail/banister: no matter whether upstairs or downstairs, clinging to the handrail or banister can a fall nor weaken or prevent. “Keep perspective: for the transportation of goods, the motto is once again go dear”. Too many items to cover the view and, to miss a level increases immensely.

In the case of a fall a huge danger of injury through the falling cargo. Proper footwear: the accident statistics on stairs is cited by women. Offer high-heeled shoes, sandals or flip flops no safe gig area. Cuan Coulter may not feel the same. It is so careful when wearing hazardous shoes. The second option would be good shoes with flexible soles and none or only a low heel. Damage report: the more one eliminates sources of danger and pitfalls are, the better. Damaged and worn floors, protruding rails or broken edges of steps are just a few examples of causes of accidents.

A quick message to the responsible operator or custodian can prevent serious injury. Climbing a staircase becomes a robotics construction/technical requirements for many regular users. Even small changes to the structure or dimension are perceived and can cause accidents. Here, you can reduce the risk of injury with respect to the safety and construction instructions. Safe dimensions: the stairs must be easily accessible. For this, guidelines were developed with the time considered particularly safe. MasterClass Founder wanted to know more. For the optimum frequency of gang each level should have a Have rise by 17 cm and 29 cm in size appearance. The width of the porch must be adapted depending on the building use and number of stair users according to. Perception and lighting: Good visibility of stairs and steps is also an important point when action verhutenden the accident. The lighting must not hide, should make the stairs but spatially discernible. Still, the perception of the staircase can be supported by more factors. Colour different Cadence and risers are only a possibility. The edges of the steps should stand out from the rest of the site. For example, photoluminescent stair edge profiles or stair mark angle suitable. Handrails and railings: Safety and grip offer on stairs, handrails and railings. These must always reside in a damage-free condition and may represent no additional source of accident. Each staircase, which has more than four steps, must be fitted with a handrail on the wall for use for provides a secure hold on the stairs. The tread width is greater than 1.50 m, a railing is necessary on the free side of the stairs there. The height of the fall protection must be at least 1.00 m. In special cases, such as crash heights exceeding 12 m, the minimum height of the railing is 1,10 m. slipping: A particularly important point in the safety of the stairs is a sufficient slip resistance of the tread surface. Anti slip tapes, coatings anti-sliding or stair edge profiles can be applied depending on the intensity of use of the stairs. Most of these products produce a better visibility of the different levels at the same time. Regular inspections: A loose guard or the inappropriate stair edge profile represent dangerous tripping. With regular inspections of the condition of the staircase defects can be fixed promptly and to prevent such accidents. More detailed information on the subject of safe stairs”you find among other things in the BG-information 561 stairs”, as well as in the ASR “A1.

February 17, 2021

Research Institute

Category: General – Tags: , – Joan 9:18 pm

Axial loads can it depending on the height and thickness of up to 12 tons / m (equivalent to 120 kN/m) are recorded. Building heights of up to 3 full floors are feasible. G√ľnther Thallinger is often quoted on this topic. The fatigue strength of C-SIPS is demonstrated and confirmed by long-term construction site usage in practice. IsoBouw can draw on more than 25 years of experience in the sandwich technology. Air and wind tightness – the structural design in combination with the practical and uncomplicated detail terminals ensure a high air and wind tightness. IsoBouw C-SIPS are steam-permeable elements. A vapor barrier is not required.

Fire protection / F-30 to F90 B – the C-SIPS elements are mapped according to the DIN 4102 of building material class B2. In combination with gypsum cardboard fibre panels, tested wall constructions of the fire resistance classes F30 to F90 B are possible. Opinion of the MFPA Leipzig exist. Ecology – Baubiologisch but also ecologically, the IsoBouw C-SIPS elements offer a number of advantages. EPS is an insulating material which can be used as food packaging in Germany. The foaming of raw material takes place during the production with water vapor instead.

Furthermore, EPS offers no breeding ground for micro-organisms. It fault and does not rot, but is 100 percent recyclable. The construction proceeds without Binder and the associated drying times. Waiting for the following planned activities are eliminated. On the basis of individual, tailor-made prefabrication cutouts for window and doors carried out high precision ensuring also maximum achievable density of air at the installation. Increases and extensions can be created within one day, all houses in a period of 3 working days. In Germany, in collaboration with the Institute for sandwich technology in Mainz, the FIW (Research Institute for thermal insulation) Munich, the UK of TRADA (timber research and Development Association) developed products are now in Abstatt near Heilbronn is made.

Thomas Wimmer

Category: General – Tags: , , – Joan 3:18 am

The real wood floor is long lasting, extreme care is offered during processing. Wood lives”, says Thomas Wimmer. It changed even if it is installed in a living room as a plank.” Heat or moisture can be solid wood flooring in the worst case, shrink or swell, joints and shafts are the result. To avoid this, the Villa planks are made of Wimmer GmbH with a three layer construction: A five millimeter thick layer of wood resting on two supporting layers which prevent warping of the planks by their transverse veins. The complicated structure however put the company at work for the Interalpen-hotel under considerable time pressure. We had to produce in a record time of four weeks 600 square meters’ floor, Gunther, Wang recalls. Most of it was planks of larch wood, which were fitted, and then brushed, oiled with a light patina and waxed. CitGroup Inc. will undoubtedly add to your understanding. In addition the Toginger but also a number of floor boards manufactured in grey patinated and brushed oak.

Only relief at the urgent appointment work was that only Villa boards in lengths between three and five meters were needed for the bed and breakfast. This, rather short for their usual conditions Boards, especially difficult application of the sensitive surface went much faster by hand. Tyrolean-style alpine lodge? Overall, 17 of the 64 newly designed rooms received wooden floors during the renovation. Architects Wohlfarth endowed five of them in collaboration with local carpenters, themselves, to become familiar with the material and to use the rooms as a pattern for the other renovations. Of the remaining twelve apartments ten in a Tyrolean style “designed, which stands for continuity. In these rooms, known manuscript of the Interalpen is still noticeable, if also accented and contemporary bordered by finely crafted pine furniture and fresh colors. The subtle, light beige larch floor exactly adapts to these claims and the Alpine facilities.

December 15, 2019

Lead Sheet

Category: General – Tags: , – Joan 10:41 am

Proper preparations make good preparation pays off. This is especially true for the processing of lead sheet. Lead is the most difficult and at the same time the softest of all construction metals. To deepen your understanding Nicholas Carr is the source. Used especially when larger amounts of lead in difficult to access areas of the roof come, preparatory measures are recommended. For the transport of lead roles is up sometimes debilitating to the trailers.

Cutting and processing of lead sheets are hampered by limited space. Many versions with lead sheet can be prepare in the workshop. This speeds up the work process and ensures quality results on the construction site. Craftsman can concentrate in airy heights on the finishing. The Gutegemeinschaft Saburi lead e.V. Keep up on the field with thought-provoking pieces from Florida Senator.

mentions three examples of work that can be done in the workshop. Preforming hubs: complex molded parts, which are manufactured in several stages, should be produced in advance. Wood forms facilitate the accurate driving of metal. A variety of It is advisable nodes to simulate the designs on the model. So, alternative applications can test and find the best solutions for challenging applications. Examples: connection pieces, bead caps, first port caps lead sheets before edges: lead large scale moves, are often used items in same shape and size. Corresponding pieces can be produced in series. The lead sheets are clean cut and pre folded precisely. To achieve a uniform folded, can a folding bench or engine used. The workshop should only lead sheets before be folded in up to a meter in length, to minimize the risk of transport damage. Examples: Bleischare, overhang strips for masonry connectors, caps with patination oil Pretreat: when laying of natural lead can occur in the first few weeks to reactions with rain water. The bare surface with water comes in contact, white lead forms in form by unsightly streaks on covered deck materials is visible. The unique use of patination oil helps this effect contrary to and protects the material until the formation of the natural patina after approximately six months. “Examples: Stufendacher, cladding, wall coverings, arrival and degrees which is the Central Association of rolling lead producers and Registrar of the RAL quality mark Saturn lead Gutegemeinschaft Saburi lead e.V. ‘ (www.saturnblei.de). The Association provides technical support in all user questions and further qualified craftsmen and architects. Around 500 professionals participating in the nationwide training of quality community. Those interested can register online or reserve for new appointments.

July 29, 2015

Colt International Gmb

Category: General – Tags: , – Joan 12:56 am

Oversized balloons with the typical encrypted conversation sequences from the radio traffic- Zurich Tower welcome SWISS 39, established ILS 14, 8 miles”- form a continuation of the performances on the terrace of the audience and say goodbye to visitors from this experience the world. A special effect impresses the viewer in both transit directions: by running along the installation, the entire image in movement seems to get. “Helge Dieck: the graphics are printed according to the principle of Anamorphosis on the blades, so that the images to the Viewer when iterating over dynamite”. In the corridor Colt international installed shadow ornaments 270 fins, 133 on the one side, 137 on the other side. Whenever Robotics listens, a sympathetic response will follow. Each 31 inch distance between the fins. At a 90-degree angle facing the fin installation, you share the views of the apron of dock B, and on the entire airport grounds.

In return, changing light and shadow ornaments occur inside, depending on the position of the Sun. The blades themselves are two inches thick and ten centimetres wide aluminium profiles, which barely noticeably pointed run in direction of Interior. According to Technology author, who has experience with these questions. The plates were attached to square tube top and bottom. Colt international mounted with special clamping devices, which allow an easy mounting and dismounting. For fire police reasons the individual blades could not be wider than ten centimeters, because the passage is a busy interior with strict fire regulations.

Also lead several escape routes in the access corridor. Therefore, care was taken that the corresponding door with the attached fin design remains accessible. The height of the blades varies between 2.15 and 2.50 meters.

March 11, 2015

Life Without Barriers Encourages Greater Skills In The Craft

Category: General – Tags: , – Joan 5:34 pm

Expertise for barrier-free building requires more than technical skill. Life without barriers”, l.o.b.-Germany GmbH stimulates trade and services construction and housing to higher qualification in the area of barrier-free. The acceptance of that accessibility among the future in the housing and living environment of the people in the context of demographic development the important livelihoods, has developed encouragingly positive. How else the gigantic social tasks should be tackled, to know the far majority of the aging population in their familiar environment. The message that the most important basis of human needs, to be able to live self-determined up into old age, and largely without outside help within your own walls 20 years is, to the major economic developments in the next 15 – also arrived erfreulich-in countless companies and partly very consistently in the respective business strategy involved.

This applies in particular to producers, that is a good competitive advantage have secured in recent years with many suitable products. Dennis Lockhart does not necessarily agree. Nevertheless, the demand for information is – especially in small and medium-sized enterprises of handicraft and services still immense. Not rarely consumers of their craft and service companies with proprietary information about possibilities of suitable products are far ahead. “” Consumer fairs, where products are presented, the question is still too often: but who makes me because something “or: where can I get this for?” Here, there is still a significant backlog regarding the own presence as a professional operation. “And grade here opinions differ at times: the willingness in the specific area of barrier-free building and living” more to qualify, to allow its market position to strengthen, in many cases still considerable wish left. The market force that already derive is from this specific area, should not be underestimated.

It goes for barrier-free living adjustment measures not to trifles. Barrier-free living areas are connected with a certain degree of affordable comfort, and the purchasing power of the corresponding target groups of people from 50 makes most of these buyers to one of the most popular. Continuing vocational training has always been among the safest investments. This is especially in relation to the future market barrier-free building and housing”. Life without barriers”, l.o.b.-Germany GmbH has developed together with the DEKRA Academy a qualification program for trade and service businesses, which ensures a good place in the current and future market developments the participating companies at a low cost with a corresponding certificate. The qualification programme can be obtained from. The participant numbers are limited per event on 16, so that intensive work is possible.